| Well drilling rigs |
| Well overhaul rigs |
| Drilling tools and equipment |
| Lifting equipment |
| Pumping equipment |
| Electrical equipment |
| Pipeline overhaul equipment |
| Catalogs |
|
|
Contacts | Products | Company |
|
Installation UPT-50
Installation UPT-50 designed for round-trip operations, sand plugs removal with a sludger, swabbing and rotary table transmission in the process of oil and gas wells completion and recovery in the absence of stationary rigs and supports. Weight-carrying capacity - up to 50 tons. Conditional well depth in the process of well completion and recovery - up to 3500 meters. |
|
| © 2019 Mehanicheskiy zavod ««Kalyazinskiy»» |