| Well drilling rigs |
| Well overhaul rigs |
| Drilling tools and equipment |
| Lifting equipment |
| Pumping equipment |
| Electrical equipment |
| Pipeline overhaul equipment |
| Catalogs |
|
|
Contacts | Products | Company |
|
Installation UPB-50A
Installation UPB-50A designed for round-trip operations with hoses and pipes in the process of sand plugs removal with a sludger and swabbing in the process of production maintenance and well-workover of gas and oil wells in the absence of stationary rigs and supports. Weight-carrying capacity - up to 50 tons. Conditional well depth in the process of well completion and recovery - up to 3000 meters. |
|
| © 2019 Mehanicheskiy zavod ««Kalyazinskiy»» |